_CASE STUDY 1

STOPPING
THE SLIDE


When this Castor Bay clifftop property lost 5 metres of its front lawn down the bank - with indications that more was about to go - the engineers jumped on the phone to PoleSpecs.

With the client's house blocking access for earthmoving equipment and the cliff unlikely to support heavy machinery, PoleSpecs worked with the engineer to devise a solution to give the house long-term support at the right price. By choppering in a small earthmover and poles, the only drama in the project was in the photos.

PoleSpecs carried out the repairs without incident, protecting the client's investment and cementing their reputation as the 'go to' guys when the stakes are high.

 